Monday, August 8, 2011

Kitchen Ceiling Lighting

This customer wanted to update the old florescent lighting, and re-contour the ceiling.

After the new appliances were in, Consider It Done Construction removed the old light fixture, textured and painted the repair, and had the new light fixture installed. 

Monday, August 1, 2011

Entry Trim Repair

Just a little dry rot repair on this entry.

Once it's painted, it looks perfect again.

One more 'After' shot...


Monday, July 25, 2011

Refinished Window Sill

 Before.
This was water damage from a potted plant. 

After.

Monday, July 18, 2011

Metal Handrails

This homeowner requested handrails at each entry.

  Consider It Done Construction was able to obtain, customize, and then install these metal railings on short notice, so the homeowner could safely use the stairs.



Monday, July 11, 2011

Bathroom Update

Before updating.

Without painting, Consider It Done Construction was able to upgrade this bathroom with a new sink and faucet, new custom countertop, light bar, and storage/vanity mirror. 



Tuesday, July 5, 2011

Quick Kitchen Backsplash

This nice kitchen, unfortunately, had a sloppy, and too low, tile back splash.

Consider It Done Construction proposed an economical solution. Instead of removing the tile, we covered it uniformly with a laminate countertop material. Now, it's as smooth and clean as the rest of the kitchen, without compromising durability.

Monday, June 27, 2011

New Exterior Steps

Wow. These stairs were so old, they were built with square nails. 

They needed to be removed and hauled away.


Just a few hours, and now the stairs are safe and solid.