Tuesday, July 15, 2014

New Vinyl Flooring and Refinished Wood Floor

Close-up of flooring in need of an upgrade, in a home that was going to be put on the market.

Same space!
Consider It Done Construction installed new vinyl flooring, a new transition strip between the vinyl and the refinished wood floor, then painted the walls. The floor base was removed, lightly sanded, painted, and re-installed.

Monday, June 23, 2014

Add a Shower to a Half Bath

Pre-Sale prep on this home included adding a shower. 

The shower stall will punch out into the garage. (Door to the right is access to the house from the garage.)

The shower is now in place, waiting for inspections. 

All done. The paint is still wet in this photo. 
Want to see the inside? 

Much improved from the 'before' picture above, right?
- New paint, new flooring, new shower. -

Sunday, January 19, 2014

Small Kitchen Renovation

This is the result of a 'light' kitchen remodel involving paint, countertops, new appliances and fixtures, lighting, and tile backsplash. Here's what we did: 

This is what we started with. 

 We removed the upper cabinet, which was blocking the view into the family room. Wow, that really opened up the kitchen.

Next, we repaired the ceiling, painted the cabinets, brought in an electrician to update the lighting, and prepped the area for the countertop guys. 

There's the beauty shot again.
Notice: The stove is no longer a cooktop, the vent hood is now a microwave/vent hood combo, and the eat-bar area has been extended. Oh, and that sweet cabinet door modification with glass fronts!
(with the assistance of designer: Kathy Hanson)

Tuesday, March 19, 2013

New Doorway

Due to a remodeling project beyond this wall, a door was needed here.

Consider It Done Construction makes it look easy. 

Monday, February 25, 2013

Dart Board and Wall Paint

This creative customer wanted help with a custom cork board to surround their dartboard. 

Consider It Done Construction painted the walls, and designed a protective area around the dartboard. The customer later added tons of wine corks to the wood to finish the design.

Monday, February 18, 2013

Door Trim

An example of a typical small project.

There, doesn't that look better? 
Consider It Done Construction installed new doors, installed new trim, and painted the doors, trim, and walls.


Monday, February 11, 2013

Bathroom Addition

This project was in a home with 2 bedrooms upstairs, and a walk-in closet. The customer wanted to convert that closet into a bathroom.
 
 
In order to communicate with the customer, Consider It Done Construction placed blue tape to show which doors would be removed, and where the shower and sink would be located.  

If you keep your eye on the shower area throughout this post, it will all make more sense.

These are the same 2 doorways after the walls were opened for plumbing and electrical. Notice the tape showing the shower (barely visible on the floor).

Work on the shower stall and walls has begun. The plumbing poking out of the wall indicates where the sink will be. This is a farmhouse, so the wainscoting was a great choice for the walls.

Shower pan work continues, and one-piece vinyl flooring has been installed. Notice the plumbing for the toilet in on the left.

First came the shower, sink/cabinet, and toilet. Then the addition of the lighting fixtures, ceiling fan, mirror, and towel rod and ring. The finished result.

(This is a fun job to scroll back to the top to see what we started with)

Monday, January 14, 2013

Wall Repair

In this home, the plumber needed to get inside the walls. 

Once the plumber was finished, Consider It Done Construction could button it up and make repairs. 

By the time we were finished, it was impossible to tell the walls were ever opened. 


Monday, November 12, 2012

Ceiling Hole too Large

 Whoops, the homeowner made the hole too big. 
Can't put a light fixture here until it's fixed. 

 The ceiling is plaster, so it took a little doing to support the repair.
 Drying. Getting better. 

Nice! 
Once the light is installed, it will look like the mistake never happened. 




Monday, February 27, 2012

Vintage Kitchen Remodel

The owners were ready to renovate this kitchen. 

The first thing we did was to remove the damaged sheetrock. Underneath, we found vintage wainscoting. The home owner (with their designers' encouragement) opted for us to restore/preserve it. 
Consider It Done Construction painted, replaced the flooring, made the trims throughout, pushed out the sink area, replaced the sink, and replaced the counters.


Before.

 During.




After.

This little cabinet to the right of the stove didn't fit.

We coordinated the construction of a new cabinet here. 
Consider It Done Construction replaced all the countertops with zinc. 

Stove area before.

Stove area after.
We worked closely with our favorite designer, Kathy Hanson on this project. She selected colors, finishes, and various changes, and also advised on the renovation of the plate holder on the wall. 


Monday, February 13, 2012

Tile Bathroom Flooring

Before.

 During.

Consider It Done Construction painted and replaced the toilet. The tile is Travertine, with an upgrade to a heated floor.  


Monday, January 2, 2012

Floor Tile Removal

See that tile threshold?

This is what it looks like after the tile has been carefully removed. 

A little paint for now, and the customer will add wall-to-wall carpeting later.