Monday, February 11, 2013

Bathroom Addition

This project was in a home with 2 bedrooms upstairs, and a walk-in closet. The customer wanted to convert that closet into a bathroom.
 
 
In order to communicate with the customer, Consider It Done Construction placed blue tape to show which doors would be removed, and where the shower and sink would be located.  

If you keep your eye on the shower area throughout this post, it will all make more sense.

These are the same 2 doorways after the walls were opened for plumbing and electrical. Notice the tape showing the shower (barely visible on the floor).

Work on the shower stall and walls has begun. The plumbing poking out of the wall indicates where the sink will be. This is a farmhouse, so the wainscoting was a great choice for the walls.

Shower pan work continues, and one-piece vinyl flooring has been installed. Notice the plumbing for the toilet in on the left.

First came the shower, sink/cabinet, and toilet. Then the addition of the lighting fixtures, ceiling fan, mirror, and towel rod and ring. The finished result.

(This is a fun job to scroll back to the top to see what we started with)