Monday, August 20, 2012

Water Damage Under Dishwasher

 This is the damage Consider It Done Construction was hired to fix. 

 Close-up of the problem.

 We cut out the damaged wood, then replaced it with new wood. 

 The area was then prepped prior to installing new vinyl flooring.

Here it is finished.

Monday, August 6, 2012

Exterior Painting Improvements

Here's a home in need of updating.


The After picture. 
Notice the landscaping, new roof, pressure washing and painting. We also removed the old/tired planter boxes that were hanging over the garage door. 

 Before.

After.



 Before.

After.

It's remarkable what a little TLC, and careful updating, can do for a home. 



Tuesday, July 31, 2012

Exterior Demo

 This was a simple demo job.

Consider It Done Construction dismantled and hauled away the lattice fence, 
and trimmed back the plants.


Monday, July 23, 2012

Pressure Washing


Consider It Done Construction can pressure wash prior to applying paint or stain.


Sometimes (like this job) we were hired to simply clean up using our high-powered machine. 


Monday, July 16, 2012

Deck Joist Replacement

 Look for the unpainted wood.
It's visible in these photos where old rotten wood was replace with new treated outdoor wood. 




Below is a close-up of the work:
 Old, damaged wood needing removal.

Same area, new wood.

Monday, July 9, 2012

The Cattery

 This unusual project was for an elderly customer who was concerned her cats would escape. The customer wanted a safe place for the cats to enjoy both a sunny interior area, and an exterior space.

 Consider It Done Construction was able to build the cattery without substantially changing the rental residence. Notice the covered area to the back?


Here's a closeup of the covered interior area. When our customer moves in the future, the entire cattery will be demolished. Leaving a typical covered patio.

It was a pleasure to construct a temporary space so the cats' safety was no longer a worry.

Monday, July 2, 2012

Bathroom Dry Rot Repair

This dry rot repair ended up being more extensive than was apparent initially. 

The tub area was affected.

During demo. Extensive dry rot was found in the floor sheeting, sub floor, and framework.

Still doing demo to find sound wood. 

The pry bar was easily stuck into the damaged wood beneath the tub. 

Notice in this hole, under the tub, the joist holding the tub is also damaged. 

All that wood, and the supporting structure underneath were repaired and reinforced. 

After repairs, the floor was sheeted with new wood, and prepped for vinyl.

Finished! 
Consider It Done Construction worked as quickly as we could on this project, because this was the only bathroom in this small home.