This dry rot repair ended up being more extensive than was apparent initially.
The tub area was affected.
During demo. Extensive dry rot was found in the floor sheeting, sub floor, and framework.
Still doing demo to find sound wood.
The pry bar was easily stuck into the damaged wood beneath the tub.
Notice in this hole, under the tub, the joist holding the tub is also damaged.
All that wood, and the supporting structure underneath were repaired and reinforced.
After repairs, the floor was sheeted with new wood, and prepped for vinyl.
Finished!
Consider It Done Construction worked as quickly as we could on this project, because this was the only bathroom in this small home.