Monday, February 27, 2012

Vintage Kitchen Remodel

The owners were ready to renovate this kitchen. 

The first thing we did was to remove the damaged sheetrock. Underneath, we found vintage wainscoting. The home owner (with their designers' encouragement) opted for us to restore/preserve it. 
Consider It Done Construction painted, replaced the flooring, made the trims throughout, pushed out the sink area, replaced the sink, and replaced the counters.


Before.

 During.




After.

This little cabinet to the right of the stove didn't fit.

We coordinated the construction of a new cabinet here. 
Consider It Done Construction replaced all the countertops with zinc. 

Stove area before.

Stove area after.
We worked closely with our favorite designer, Kathy Hanson on this project. She selected colors, finishes, and various changes, and also advised on the renovation of the plate holder on the wall. 


Monday, February 13, 2012

Tile Bathroom Flooring

Before.

 During.

Consider It Done Construction painted and replaced the toilet. The tile is Travertine, with an upgrade to a heated floor.